Glad to see that they've reshaped the concrete -- did the removal of the mispoured section of slab delay you or will you still within the concrete "curing" time?
I'd say we lost about a week. They're still about two weeks ahead of schedule, however, so I can't complain. Southern California in the summer the "curing" time is about a day! We found out today that the pipe was laid too far out from the wall for the sink in the guest bathroom. That's gonna require another jackhammering to the slab in that area. Drat. Our contractor said that the framing will continue uninterupted.
2 comments:
Glad to see that they've reshaped the concrete -- did the removal of the mispoured section of slab delay you or will you still within the concrete "curing" time?
I'd say we lost about a week. They're still about two weeks ahead of schedule, however, so I can't complain. Southern California in the summer the "curing" time is about a day!
We found out today that the pipe was laid too far out from the wall for the sink in the guest bathroom. That's gonna require another jackhammering to the slab in that area. Drat. Our contractor said that the framing will continue uninterupted.