Things are humming along pretty well with the framing. They've been putting up ceiling boards on the second floor, so it looks like actual, closed-in rooms up there now. I think the only change that's coming is that the lowest of three windows on the stairwell needs to be moved or resized, since a few inches of staircase intersect it right now.
We're having a design meeting with James in a week or so to see what he's been cooking up for some interior ideas. Here's an approximate exchange from our last meeting:
"So, do you have any ideas on exterior paint colors, James?" I asked.
"Yes," replied James.
I love the mystery! Is it that he can't reveal the colors until he thinks we're emotionally prepared for it? Is there a method of presentation that transcends simply blurting out "Sea Foam!"?
7.18.2006
Framing update
Posted by John Edgar Park at 9:14 AM
Labels: framing, Leanarch, paint, windows/doors
No comments:
Post a Comment