We've been told the final inspection for Certificate of Occupancy is scheduled for today. Angel got the stair rails up last week, which was the last thing needed before the inspection, I think.
We need to walk around and make a punch list to figure out what zillion little things remain that aren't for the C of O, but need to get done. Stuff like swapping the mirrors in the bathrooms, fixing the cracked glass wall in the shower, screwing down the drain covers in the showers, moving the cable drop point, blah, blah, blah.
I've also got a call in to Burbank Water and Power to see if everything has finally been submitted by California Solar for the reimbursement.
No comments:
Post a Comment