6.26.2006
Overhang
I looked at the schedule and the rough framing was slated for thirty days. It's only been ten days so far. Will it really take another twenty to finish that? I don't think so, but it's important to remember that I have no idea what I'm talking about.
Posted by John Edgar Park at 8:49 PM 2 comments
Labels: framing
6.24.2006
6.21.2006
Framing panorama
Here is a 360 degree cylindrical panorama of the framing. Click and drag the image to spin around. If this doesn't work for you, grab the QuickTime software for your browser here.
Posted by John Edgar Park at 10:42 PM 1 comments
6.20.2006
Framing is great
One downside to framing is that it's a manly, violent artform that can lead to a baseball-sized hole being punched through the wall over your toddler's bed.
Posted by John Edgar Park at 2:22 PM 3 comments
Labels: framing
6.15.2006
Wood drop
Posted by John Edgar Park at 9:24 AM 3 comments
Labels: framing
Concrete grooves
In reply to a question posted in the comments, the mistake with the slab cost about a week of time. No real worries, since they are still about two weeks ahead of schedule.
Posted by John Edgar Park at 9:21 AM 0 comments
Labels: concrete
6.08.2006
6.01.2006
Slab shape
Posted by John Edgar Park at 7:54 PM 2 comments
Slab
Posted by John Edgar Park at 12:30 PM 1 comments
5.30.2006
Puzzlefloor
Posted by John Edgar Park at 8:37 AM 0 comments
5.26.2006
Inspection passed
The inspector gave the go ahead to begin pouring concrete; I'll post pictures of that later.
Posted by John Edgar Park at 9:33 AM 1 comments
Labels: concrete
5.25.2006
Plumbed
Posted by John Edgar Park at 11:57 AM 0 comments
