1.12.2007
The difference a quarter-inch can make
Yep. Six and one-quarter inches.
Grrrr.
Posted by John Edgar Park at 10:50 AM 2 comments
1.10.2007
Bathroom floor tile
Posted by John Edgar Park at 3:26 PM 4 comments
Labels: interior
1.06.2007
Stone or porcelain?
However, JP isn't sold on the idea.
Although we like slate, I think we've finally agreed to go with something fairly light-colored, maybe limestone, (like this), and find some more expensive tile to accent. I'm really liking this "bamboo".
Originally we thought we'd go with something more like this offset mosaic or zen weave.
But I'm feeling like I need more calm. Perhaps because I'm spending too much time with my three-year-old?
Just found this one that JP and I are both liking, although we haven't seen it in real life. I'll win him over to the porcelain side yet! Daltile that looks kind of like linen.
Posted by John Edgar Park at 8:47 PM 4 comments
Labels: interior
1.05.2007
Where to get bathroom furniture?
Any suggestions on nice-looking, moderately-priced, modern cabinet/vanity/sink? Ikea is letting us down here, as far as the master bathroom goes. Their stuff's too small. We have a space around 45" wide. Help!
Posted by John Edgar Park at 4:20 PM 2 comments
1.04.2007
1.03.2007
1.02.2007
Erin's door concept
Posted by John Edgar Park at 11:21 AM 3 comments
Labels: paint, windows/doors
Inspection passed, drywall to begin
I just spoke with J.D., who relayed the good news. We now have to pick our bathroom tile and stone, because everything will start happening very quickly. I'm not sure what other outstanding decisions we have to make, but J.D. said he'll pass that info along with the revised schedule in the next couple of days.
Posted by John Edgar Park at 10:25 AM 0 comments
12.29.2006
Paper is up
Posted by John Edgar Park at 9:06 AM 2 comments
12.23.2006
Insulation
Posted by John Edgar Park at 3:11 PM 0 comments
Labels: panorama
12.19.2006
Roofing
We've been passing various inspections without too much trouble and the roofing guys are busily roofing away. J.D. said that the insulation will be going in soon, and after that the drywall. I've been telling people that we'll host a party once the drywall is in. More details to come.
We're awaiting an official, revised schedule, but we've been able to divine from J.D. that the house should be done sometime in February. (Historical note: The original end date was yesterday.) Not too far off track, but it seems that hitting that date would have cost a lot more money. I don't know if that's because of overtime/weekends or simply paying sub-contractors to "forget" about their other jobs for a little while.
Posted by John Edgar Park at 11:38 AM 2 comments
12.03.2006
All the windows and doors are in
Posted by John Edgar Park at 1:50 PM 2 comments
Labels: windows/doors
12.01.2006
Where it's at
We met with James and J.D. the other evening to go over some design and schedule items. Looks like we're going to be slipping on the schedule a bit in order to keep costs down. Not sure yet what the new end date is, but we should hear back next week on that.
Design-wise, James brought some seriously cool samples of materials to look at. We have narrowed down the stair treads and upstairs flooring to either the reclaimed, vertical-cut Douglas Fir or a pre-finished hardwood plank (I forget which hardwood it was made of, I'll post a photo soon). The planks fit together like a Pergo system, with no bevel between boards, so you can't really tell it's not smaller strips.
The master bathroom. Very nice array of stone tiles to look at. We're thinking of doing large cuts on the floor, smaller on the walls and an accent strip of colored (glass?) tiles up the vanity column.
Today, the electricians are back to install can lights in the kitchen. I can't wait to have real light in there when I'm cooking!
The structural inspection went very well earlier this week, with only a couple of minor corrections that can apparently be photographed when complete to save the cost of another on-site.
Posted by John Edgar Park at 12:36 PM 2 comments
Labels: electrical, interior, Leanarch
